Trail Status Live Trail list →

Settlers Park — Mountain Bike Trail Conditions

Live mountain bike trail conditions for Settlers Park, 7 miles in Oakland County, southeast Michigan. This page shows current rideability, a trail-specific drying model, recent weather, and rider reports — updated every 30 minutes.

MCMBA-built stacked loops. Difficulty Green–Blue. Ride character: flow, tech.

Loops: Loop 1 2 mi · Loop 2 3 mi · Loop 3 1.6 mi.

Settlers Park drains at an average rate — a mix of soil types and trail design typically needs 24–48 hours to dry after significant rain. Parking at Main lot · Meijer lot. Please ride responsibly and stay off muddy or saturated trails to avoid causing damage.

Nearest other trails: Milford 8 mi · Highland Recreation Area 8 mi · Island Lake Recreation Area 10 mi. trail guide. Browse all trail conditions.

About · Feedback & contact →