Trail Status Live Trail list →

Stony Creek Metropark — Mountain Bike Trail Conditions

Live mountain bike trail conditions for Stony Creek Metropark, 12 miles in Macomb County, southeast Michigan. This page shows current rideability, a trail-specific drying model, recent weather, and rider reports — updated every 30 minutes.

Singletrack — 5 stacked one-way loops + two-track. Difficulty Green–Black. Ride character: flow.

Loops: Green (Easy) 2.5 mi · Blue (More Difficult) 6.8 mi · Black (Most Difficult) 2.8 mi · Two Track (Easy) 9.2 mi.

Stony Creek Metropark drains fast — sandy or loamy soil and/or good runoff design let it recover within 24–36 hours after significant rain. Parking at Shelden Trails. Please ride responsibly and stay off muddy or saturated trails to avoid causing damage.

Nearest other trails: Bloomer Park 3 mi · Bald Mountain Recreation Area 6 mi · River Bends Park 6 mi. trail guide · trail map. Browse all trail conditions.

About · Feedback & contact →