Trail Status Live Trail list →

DTE Energy Foundation Trail — Mountain Bike Trail Conditions

Live mountain bike trail conditions for DTE Energy Foundation Trail, 22 miles in Jackson and Washtenaw counties, southeast Michigan. This page shows current rideability, a trail-specific drying model, recent weather, and rider reports — updated every 30 minutes.

Singletrack — 4 stacked loops. Difficulty Green–Black. Days with a T (Tue, Thu, SaT) ride anTi-clockwise, all other days clockwise. Ride character: flow, tech, XC.

Loops: Green Lake 5.2 mi · Big Kame 4.8 mi · Winn 8 mi · Sugar 4 mi.

DTE Energy Foundation Trail drains fast — sandy or loamy soil and/or good runoff design let it recover within 24–36 hours after significant rain. Parking at DTE Trail (M-52) · DTE Cassidy · B2B (Lyndon Town Hall) · McClure. Please ride responsibly and stay off muddy or saturated trails to avoid causing damage.

Nearest other trails: Waterloo-Pinckney Connector 3 mi · Potawatomi Trail (Poto) 7 mi · Sharon Mills 13 mi. trail guide · trail map. Browse all trail conditions.

About · Feedback & contact →