Live mountain bike trail conditions for Sharon Mills, 3 miles in Washtenaw County, southeast Michigan. This page shows current rideability, a trail-specific drying model, recent weather, and rider reports — updated every 30 minutes.
Short, gentle loops along the River Raisin. Difficulty Green. Ride character: XC.
Sharon Mills drains at an average rate — typically needs 40–60 hours to dry after significant rain. Parking at Main lot. Please ride responsibly and stay off muddy or saturated trails to avoid causing damage.
Nearest other trails: DTE Energy Foundation Trail 13 mi · Waterloo-Pinckney Connector 15 mi · Heritage Park 18 mi. trail guide. Browse all trail conditions.